O Scale Logo  O Scale Progress Summer-Fall 2008 GSMRM Logo
  Updated: January 12, 2021 
Home Visit Our Layouts Theme Days Newsletter History Media Memberships Contact Members
previous next 23 images


O Scale Progress Summer-Fall 2008

During the Summer-Fall of 2008, the GSMRM O Scale group has continued with the scenery area between Midway and the Zenith yards. The base plaster work is ready for rock castings. A new siding for the oil refinery is being built. It will link the refinery to the Midway yard tracks. Plaster webbing and tunnel portals have been installed under the refinery.

Additional abrasive type track cleaning cars were custom built to improve our operations.

Work on the On3 scenery has also continue with most of the visible areas now plastered and some texturing and tree work completed. A new stamp mill was built and installed. Trains can now run on the Palisade division.

Work on the remote control of the Post Rd junction and Passenger yard from the Arrival control panel is operational. Route and block relay boards are installed at Post Rd and the Passenger yard and a sub panel was added to the Arrival panel to show and control train movements through the Post Rd, Passenger areas. Four remote video cameras can be used by the Arrival panel for viewing train movements from Post Rd to/from the Passenger yard. In addition, the Midway block 5 control was converted to allow remote operation from Arrival-Departure area.

The computer interface prototype (OSCI) has been moved to the layout and connected to the control bus linking Arrival, Midway, Post Rd and the Passenger Panels. Each of these areas has an OSCI interface board which connects to the OSCI bus and the various relay boards on the control panels.

The O scale public and member web sites have been updated. Take a look at http://www.gsmrm.org/o_scale/index.shtml or http://www.gsmrm.org/members/o_scale/.

-> Click thumbnail image for larger view and more information, click < or > on top menu bar to scroll pictures, or home icon to return.

--Pictures by Jeff Rowe unless otherwise noted.

ON3 Stamp Mill by Jim Ambrose
ON3 Stamp Mill by Jim Ambrose
O Scale Track Cleaning Car bottom view
O Scale Track Cleaning Car bottom view
Refinery sub roadbed work (Bob Brown)
Refinery sub roadbed work (Bob Brown)
New Post Rd Remote panel at Arrival
New Post Rd Remote panel at Arrival
New Post Rd Remote panel at Arrival
New Post Rd Remote panel at Arrival
Midway and Arrival Block 5 pushbutton cab selection control
Midway and Arrival Block 5 pushbutton cab selection control
On3 scenery from harbor area. 7-9-08
On3 scenery from harbor area. 7-9-08
Bob Brown laying ties for refinery siding.
Bob Brown laying ties for refinery siding.
Refinery ties, turnouts
Refinery ties, turnouts
Refinery overview
Refinery overview
Cab Selector Board-Pass_S1-S4
Cab Selector Board-Pass_S1-S4
OSCI Accessory Control Board-Pass Panel
OSCI Accessory Control Board-Pass Panel
Add hinges to Pass panel and rewire (rowe)
Add hinges to Pass panel and rewire (rowe)
Pass Panel showing Route and Block relay boards, plus OSCI board (blue).
Pass Panel showing Route and Block relay boards, plus OSCI board (blue).
Carl Dean GS4 Donation
Carl Dean GS4 Donation
 Carl Dean NP passenger cars.
Carl Dean NP passenger cars.
JIm Ambrose Tree Manufacturing Ltd.
JIm Ambrose Tree Manufacturing Ltd.
Jim Ambrose Tree Manufacturing Ltd.
Jim Ambrose Tree Manufacturing Ltd.
On3 stamp mill area
On3 stamp mill area
Rowe at work on upper Midway webbing
Rowe at work on upper Midway webbing
Upper Midway webbing
Upper Midway webbing
Views of Ambrose’s tree plantings
Views of Ambrose's tree plantings
On3 scenery progress
On3 scenery progress
 
O Scale Logo O Scale Home /  GSMRM Home GSMRM Logo
 Comments to O Scale Trainmaster © 2024 by GSMRM