During Winter 2012, the O Scale group completed work on three major projects. Following the work started last Fall, the streets and sidewalks in the Pt. Richmond harbor and town areas were added. Street lights, signals and figures any many small details were also added to give a very nice appearance. Over two Saturday work days were needed to cover the south mountain extension with plaster cloth and a layer of plaster. It is now ready for rock castings which will take the remainder of the year to complete. Finally, we rebuilt the Arrival east yard ladder with number eight turnouts to match the other yard ladders and insure better tracking through the yard. A couple of additional yard stub tracks were added for way freight storage. Relay boards were added to the Midway panel for automatic route setting of the west and east ladders. A new electrical circuit was added for the computer area and the OSCI computer was installed and updated for the latest version of JMRI and OSCI. The video switch back panel was made more accessible and all the camera inputs relabeled to relate to actual position and direction of view. We also entertained the O Scale West visitors in February.

On the Eureka & Empire On3 layout, work progressed on the lower Eureka yard, scenery and building additions. A NCE DCC system was installed and testing is underway.

--Jeff Rowe, O Scale TrainMaster

There are three pages of index pictures. On each page, click pictures to enlarge and then follow navigation arrows to next or preceeding pictures.

John Engel paving Pt. Richmond Streets, 28 Dec 2011
John Engel paving Pt. Richmond Streets, 28 Dec 2011
John Engel paving Pt. Richmond Streets, 28 Dec 2011
John Engel paving Pt. Richmond Streets, 28 Dec 2011
Midway West ladder route relay board, Rowe, Jan 12
Midway West ladder route relay board, Rowe, Jan 12
Midway West ladder route relay board, Rowe, Jan 12
Midway West ladder route relay board, Rowe, Jan 12
Bob Brown, Andy Olson, South Mtn plaster underlayment, Sat 14 Jan 12
Bob Brown, Andy Olson, South Mtn plaster underlayment, Sat 14 Jan 12
Jeff Heller, South Mtn plaster underlayment, Sat 14 Jan 12
Jeff Heller, South Mtn plaster underlayment, Sat 14 Jan 12
Bob Brown, South Mtn plaster underlayment, Sat 14 Jan 12
Bob Brown, South Mtn plaster underlayment, Sat 14 Jan 12
South Mtn plaster underlayment, Sat 14 Jan 12
South Mtn plaster underlayment, Sat 14 Jan 12
South Mtn plaster underlayment, Sat 14 Jan 12
South Mtn plaster underlayment, Sat 14 Jan 12
Rob Fassano working on Midway electric, 14 Jan 12
Rob Fassano working on Midway electric, 14 Jan 12
Midway OSCI Acces. & AIU boards
Midway OSCI Acces. & AIU boards
Midway Panel with PushButtons
Midway Panel with PushButtons
Midway Panel Route Relay Boards
Midway Panel Route Relay Boards
OSCI multiple screen testing
OSCI multiple screen testing
Depart train run to  w lead, D2, D3
Depart train run to w lead, D2, D3
Full Layout
Full Layout
Workday 4 Feb 2012
Workday 4 Feb 2012
Workday 4 Feb 2012, John  Engel, Andy Olson
Workday 4 Feb 2012, John Engel, Andy Olson
Jeff Rowe, Workday 4 Feb 2012
Jeff Rowe, Workday 4 Feb 2012
Mark Francis, Andy Olson, Workday 4 Feb 2012
Mark Francis, Andy Olson, Workday 4 Feb 2012
Rob Fassano, Workday 4 Feb 2012
Rob Fassano, Workday 4 Feb 2012
Workday 4 Feb 2012
Workday 4 Feb 2012
Workday 4 Feb 2012
Workday 4 Feb 2012
A messy Workday 4 Feb 2012, Jeff Rowe
A messy Workday 4 Feb 2012, Jeff Rowe
Arrival turnouts. Andy Olson points, Jeff Rowe assembly.
Arrival turnouts. Andy Olson points, Jeff Rowe assembly.
OSW 10Feb12:Rowe,Leahy,Ambrose,Cabral,Campbell,Olson
OSW 10Feb12:Rowe,Leahy,Ambrose,Cabral,Campbell,Olson
Mike Leahy, Gene Cabral OSW, 10Feb12
Mike Leahy, Gene Cabral OSW, 10Feb12
Arrival East Ladder rebuild, 15Feb12
Arrival East Ladder rebuild, 15Feb12
John Engel, Arrival East Ladder rebuild, 15Feb12
John Engel, Arrival East Ladder rebuild, 15Feb12
New ties installed by John Engle, Mark Francis, Jeff Rowe, Jim Trenkle
New ties installed by John Engle, Mark Francis, Jeff Rowe, Jim Trenkle
 
O Scale Logo O Scale Home /  GSMRM Home GSMRM Logo
 Comments to O Scale Trainmaster © 2024 by GSMRM