O Scale Progress-Summer-Fall 2012

Our 2012 season was probably our best operating season in the last few years. We had very few electrical or track problems which made for enjoyable and fun times during our Sunday run days. Thanks to all our members for helping to make the layout as trouble free as possible and to all our crew members who keep the trains running!

During Summer and Fall months of 2012, the O Scale group completed work in several areas. Water has been added to the Pt. Richmond harbor area, along with surface details. Overall, it looks very realistic and greatly adds to the Pt. Richmond city scene. The Midway turntable drive system was rebuilt using a belt drive and relay controller. This will provide for much more reliable and maintainable operations. The Post Road double slip switch points rebuilt to allow better gaping and more reliable operation.

Additional framing for the completion of the south mountain has been installed. The lower level is now ready for rock castings which will be undertaken during our 2013 winter break.

Additional block detectors were added to Midway so OSCI can auto dispatch and run trains from Departure to Midway and return. A relay polarity reverser for Midway track 28 was installed so OSCI can reverse DCC polarity for trains. A successful OSCI auto dispatcher test run from Departure track 11b to Midway and back to Arrival track 1a.  A total of 25 block were traversed without error! Train paused  at Midway on track 28, auto changed track polarity before returning.

A refurbished Aristo Craft power supply was added to the Interurban line and wiring of the Churchill yard area is underway.

The Zenith video display is now linked to the Midway display. Includes a camera zoom capability.

At the December scale meeting, Jeff Rowe was re-elected as 2013 O Scale Trainmaster. Other news can be found in meeting minutes.

--Jeff Rowe, O Scale TrainMaster

The O scale public and member web sites have been updated, including new track plans for the SFW and On3 layouts, list of past train masters. http://www.gsmrm.org/o_scale/index.shtml .

-> Click thumbnail image for larger view and more information, click < or > on top menu bar to scroll pictures, or home icon to return.

--Pictures by Jeff Rowe unless otherwise noted.

OSCI Arrival Display
OSCI Arrival Display
John Engel starting work on the Pt. Richmond harbor, 11 May 2012
John Engel starting work on the Pt. Richmond harbor, 11 May 2012
John Engel starting work on the Pt. Richmond harbor, 11 May 2012
John Engel starting work on the Pt. Richmond harbor, 11 May 2012
John Engle showing plastic sheet wave texture. 25 May 12
John Engle showing plastic sheet wave texture. 25 May 12
OSCI with JMRI mini web server
OSCI with JMRI mini web server
OSCI with JMRI mini web server
OSCI with JMRI mini web server
OSCI with JMRI mini web server
OSCI with JMRI mini web server
John Engel working on Pt. Richmond Harbor templates
John Engel working on Pt. Richmond Harbor templates
Run Day Crew 061012 Jeff Heller
Run Day Crew 061012 Jeff Heller
Run Day Crew 061012 Josh
Run Day Crew 061012 Josh
Run Day Crew 061012 Engel,Trenkle
Run Day Crew 061012 Engel,Trenkle
Run Day Crew 061012 Heller
Run Day Crew 061012 Heller
Run Day Crew 061012 Carpoff
Run Day Crew 061012 Carpoff
Way Freight train at Midway
Way Freight train at Midway
Way Freight car at Midway
Way Freight car at Midway
Way Freight car at Midway
Way Freight car at Midway
Pt Richmond Water project by John Engel, 25 June 12
Pt Richmond Water project by John Engel, 25 June 12
Pt Richmond Water project by John Engel, 25 June 12
Pt Richmond Water project by John Engel, 25 June 12
Pt Richmond Water project by John Engel, 25 June 12
Pt Richmond Water project by John Engel, 25 June 12
P1060116
P1060116
Harbor water detailing, 3 Aug 2012 John Engel
Harbor water detailing, 3 Aug 2012 John Engel
Harbor water detailing, 3 Aug 2012 John Engel
Harbor water detailing, 3 Aug 2012 John Engel
Harbor water detailing, 3 Aug 2012 John Engel
Harbor water detailing, 3 Aug 2012 John Engel
Midway turntable repower, Rowe, 20 Aug 2012
Midway turntable repower, Rowe, 20 Aug 2012
Midway turntable repower, Rowe, 20 Aug 2012
Midway turntable repower, Rowe, 20 Aug 2012
Midway turntable repower, Rowe, 20 Aug 2012
Midway turntable repower, Rowe, 20 Aug 2012
Turntable relay control board
Turntable relay control board
Turntable relay control board
Turntable relay control board
Turntable relay control board
Turntable relay control board
Double Slip center points rebuld, jr 19 oct 12
Double Slip center points rebuld, jr 19 oct 12