O Scale Progress .Summer-Fall 2010-Arrival Panel with 4 channel monitor for Passenger yard | |||
Updated: January 12, 2021 |
Home | Visit | Our Layouts | Theme Days | Newsletter | History | Media | Memberships | Contact | Members |
Arrival Panel with 4 channel monitor for Passenger yard |
Arrival Yard Main Cab Route set for blk
Arrival Loop, A3,A2,West Lead, Track 3.
Local Cab set for Track 1, Track 1X, Track R2.
Note: blue detector light for train in Arrival
Loop.
Also, Skyway crossover set for block D3 to block
5X. Blocks 5x,5Main set to use Departure power.
Main Cab using power Arr-1; Local Cab using power
RC-A.
Blk 5 Main set for Departure. Turnout 5Xe routes power from 5 Siding or 5 Main to block 5X. There is no on-off power switch for 5X, so trains must run thru to A4,D4 or 5 Siding or Main,
Page: 21 of 42 (50%)
O Scale Home /
GSMRM Home
Comments to O Scale Trainmaster
© 2024 by GSMRM